Environmental

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

Tripolis ring road
12/10/2024
This study aims to renew the environmental permit for Tripolis’ new ring road.

Asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area
11/5/2024
Environmental study for the installation of a new asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area

The aim of the project is to obtain an environmental permit for flood flow protection works in Isthmia