2026
Private
Finished
The aim of the technical environmental study is to define a temporary area for local concrete installation during Naxos' airport expansion construction.
The aim of the technical environmental study is to define a temporary area for local concrete installation during Naxos' airport expansion construction.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
New environmental permit for an existing concrete plant in Sarantapihiotika, Municipality of Xylokastro - Evrostina.