2026
Private
Finished
The aim of the technical environmental study is to define a temporary area for local concrete installation during Naxos' airport expansion construction.
The aim of the technical environmental study is to define a temporary area for local concrete installation during Naxos' airport expansion construction.
The aim of the study is to renew the environmental permit for an existing concrete plant in Gkagkania, Municipality of Evrotas
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.