Environmental

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period
Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

Renewal of kernel oil installation permit in Argos - Mykines
Renewal of kernel oil installation permit in Argos - Mykines

This study aims to renew an environmental permit of a kernel oil refinery in Argos - Mykines.

Environmental permit for fishery port in Loutraki
Environmental permit for fishery port in Loutraki

This study aims to modify and renew the environmental permit for a fishery port in Loutraki.

Environmental permit renewal of children’s camp in Corinth
Environmental permit renewal of children’s camp in Corinth

Environmental permit renewal of children’s camp in Corinth of a total capacity of 1650 children per period

Modification of Lygourio waste water treatment plant
Modification of Lygourio waste water treatment plant

The aim of the project is to modify the treatment process of Lygourio waste water treatment plant.

Tripolis ring road
Tripolis ring road

This study aims to renew the environmental permit for Tripolis’ new ring road.

Asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area
Asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area

Environmental study for the installation of a new asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area

Trikorfo irrigation network environmental permit
Trikorfo irrigation network environmental permit

New environmental permit for trikorfo irrigation network.

Environmental permit for flood flow protection works in Isthmia
Environmental permit for flood flow protection works in Isthmia

The aim of the project is to obtain an environmental permit for flood flow protection works in Isthmia

Design of circular interchange at Platsa, Tripolis
Design of circular interchange at Platsa, Tripolis

Environmental permit for a new circular interchange at Platsa, Tripolis.

Environmental impact assessment study for Agios Georgios port expansion in Monemvasia
Environmental impact assessment study for Agios Georgios port expansion in Monemvasia

The aim of the study is to obtain an environmental permit for the re-construction of the existing port in Neapoli.

Environmental Impact Assessment for the addition of a waste treatment and recycling of excavation, construction and demolition (AEKK) waste
Environmental Impact Assessment for the addition of a waste treatment and recycling of excavation, construction and demolition (AEKK) waste

Environmental Impact Assessment for the addition of a waste treatment and recycling of excavation, construction and demolition (AEKK) waste in an active quarry/