2026
Private
Finished
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas. This plant had a non-expired environmental permit.
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas. This plant had a non-expired environmental permit.
The aim of the study is to renew the environmental permit for an existing concrete plant in Gkagkania, Municipality of Evrotas
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.