The aim of this project is to delineate a small stream in Argolida Prefecture
This project modifies the water treatment facility’s disposal method in Agistri island.
Technical consultant for Peloponnesus Water Directorate: water use permits, legal advisor, technical advisor.
The aim of the study is to design common areas and main roads in Molaoi city expansion.
Mavrolimni stream delineation with flood protection works in Perachora according to Law 4258/2014.
Stream delineation with flood protection works in Perachora according to Law 4258/2014.
This hydraulic - environmental study aims to enhance the water supply installation of Sikyonia.
New hydraulic and environmental studies for a desalination plant in Killada Hills.
Complete custom architectural study for Almyros’ ring road area redesign.
This consultancy aimed to organize a complete proposal for the waste treatment installation upgrade.
This is a complete study for modifying flood protection works and for a private port in Waterfront, Navarino, Messinia.
Small stream delineation in Nemea according to Laws 1650/1986 and 3010/2002.