Environmental permit renewal of children’s camp in Corinth of a total capacity of 1650 children per period
The aim of the project is to modify the treatment process of Lygourio waste water treatment plant.
This study aims to renew the environmental permit for Tripolis’ new ring road.
Environmental study for the installation of a new asphalt mixing plant, ready mixed concrete production and aggregates unit in Stymfalia area
New environmental permit for trikorfo irrigation network.
The aim of the project is to obtain an environmental permit for flood flow protection works in Isthmia
Environmental permit for a new circular interchange at Platsa, Tripolis.
The aim of the study is to obtain an environmental permit for the re-construction of the existing port in Neapoli.
Environmental Impact Assessment for the addition of a waste treatment and recycling of excavation, construction and demolition (AEKK) waste in an active quarry/
The aim of this project is to modify the environmental permit of Stymfalia’s irrigation network and more specifically to move a water tank to a different position.
New environmental permit for modifying the existing permit for the gravel quarry in Gka.
New environmental permit for adding auxiliary uses in the gravel quarry in Gka.