2025
Private
Finished
The aim of the study is to modify the environmental permit of a children’s camp in Corinth of a total capacity of 1650 children per period, due to the expansion of the total area of the camp.
The aim of the study is to modify the environmental permit of a children’s camp in Corinth of a total capacity of 1650 children per period, due to the expansion of the total area of the camp.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.