New fertilizer production plant with mixing

The aim of these studies was to obtain an environmental permit for the new fertilizer production plant with mixing in Examilia and to recognize the road as pre-existing year 1923.
New fertilizer production plant with mixing
2025
Private
Finished

The aim of these studies was to obtain an environmental permit for the new fertilizer production plant with mixing in Examilia and to recognize the road as pre-existing year 1923, in order to obtain a building permit.

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit modification for Psilos Cavos fish farming
Environmental permit modification for Psilos Cavos fish farming

Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.

Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis
Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis

Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.

Technical environmental study for Naxos' airport expansion
Technical environmental study for Naxos' airport expansion

Technical environmental study for Naxos' airport expansion construction.