The aim of the study was to obtain an environmental permit for rainwater drainage flood protection works in Molaoi.
New sewer treatment plant in Meganisi that will treat all the municipal waste in the island.
Landscapping in Elafonisos’ common areas, including the coastline.
Design of sewer network and waste management facility in Elafonisos village in Elafonisos.
Environmental Impact Study regarding coastal protection from erosion and artificial reefs at the bottom of the sea at ’St. Nicholas ’, Municipality of Pylou - Nestoros (Messinia).
New water network and related infrastructure design in Muheza, Tanzania.
This study is for a private port in Kalamata area.
This study is for a new pyrolysis factory in Korinthos, that will convert urban waster to energy and oil.
New sewer network, waste treatment plant and environmental study in the settlment of Korfos, Corinth.
A complete study for the design of a new junction in Molaoi - Sparti national road.
Replacement of water supply pipe at Anavra, Almyros including environmental impact assessment.
Environmental study for Dyrachi irrigation network in Megalopoli