This study aimed to renew an expired wind park environmental license and modify it.
This Technical Environmental Study concerns the temporary installation of a crusher - recovery complex for creating fill material out of unneeded excavations.
Modify and renew the approved environmental terms of a Wind Farm (4.8 MW capacity) of WRE Hellas, in ’Alonia’, Municipality of Monemvasia.
Punda pier is used for traveling back and forth to Elafonissos island.
The purpose of this study is to design the operation of the parking lot in the Port of Corinth.
This Environmental Impact Assessment concerns a Quarry for production of inert materials.
This study aims to calculate necessary actions in order to restore the original water depths in the port of Corinth
The aim of the study was to obtain an environmental permit for rainwater drainage flood protection works in Molaoi.
New sewer treatment plant in Meganisi that will treat all the municipal waste in the island.
Landscapping in Elafonisos’ common areas, including the coastline.
Design of sewer network and waste management facility in Elafonisos village in Elafonisos.
Environmental Impact Study regarding coastal protection from erosion and artificial reefs at the bottom of the sea at ’St. Nicholas ’, Municipality of Pylou - Nestoros (Messinia).