Technical environmental study for minimizing the cost of wind farm construction

This Technical Environmental Study concerns the temporary installation of a crusher - recovery complex for creating fill material out of unneeded excavations.
Technical environmental study for minimizing the cost of wind farm construction
2017
Private
Finished

This Technical Environmental Study will minimize the cost during wind farm construction phase of a total capacity of 12 MW at Messinia, by utilizing an in-site stone crusher which will create suitable by products that will be used during the wind farm construction.

APPROVED

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Renewal of Nemea’s waste water treatment environmental permit
Renewal of Nemea’s waste water treatment environmental permit

Renewal of Nemea’s waste water treatment environmental permit

Environmental permit renewal for an existing concrete plant in Nemea
Environmental permit renewal for an existing concrete plant in Nemea

Renewal of expired environmental terms of an existing private concrete facility in Nemea.

Environmental permit renewal for an existing concrete plant in Corinth
Environmental permit renewal for an existing concrete plant in Corinth

Renewal of expired environmental terms of an existing private concrete facility in Corinth.