2016
Municipality of Corinth
Finished
The purpose of this study is to design the operation of the parking lot in the Port of Corinth. In particular, the organization, operation and accident handling are re-designed from scratch.
The purpose of this study is to design the operation of the parking lot in the Port of Corinth. In particular, the organization, operation and accident handling are re-designed from scratch.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.