The aim of this study is the restoration of the road in Asprogerakata - Pefkoulia road in Lefkada, approximately 1.7 km in length.
This study deals with land survey for the design and configuration of traffic junctions and to accommodate the requirements of the sustainable mobility study.
A new bridge for pedestrians accompanied by a traffic study, in front of a high school in Perama.
This study aims to old coastline relocation at Myssiria in Crete.
The aim of the project is to reconstruct the existing sewer network in Poros in order to restore its functionality.
The purpose of this study is to propose necessary reparation actions for a damaged road in Vourli area in Syros.
Complete design of a new kindergarten in Sparti for 45 children.
Land survey in Molaoi hospital, building and surrounding area.
This study focuses of the deign of a new fire and rescue access road around PPC’s Samos energy production plant.
New land survey and new sewer network in Pallini.
New land survey and new sewer network in Gerakas
Complete custom architectural study for Mazaraki’s main road area redesign.