2018
Private
Finished
The area under consideration a part of a wider area defined as old coastline. The purpose of the study is to correct a wrong placement of the old coastline.
The area under consideration a part of a wider area defined as old coastline. The purpose of the study is to correct a wrong placement of the old coastline.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.