2021
Municipality of Almyros
1,900,000
Finished
This study aims to re-design Almyros’ ring road, after the recent floods which destroyed part of the road. This is a complete study, with storm network and lighting.
This study aims to re-design Almyros’ ring road, after the recent floods which destroyed part of the road. This is a complete study, with storm network and lighting.