Water network masterplan for Lesvos island
The aim of this study is the design of new water pressure pipes mainly for irrigation and drinking water supply in western Milos.
Synantsaki stream delineation, municipality of Rethymno
Hydraulic and environmental study for flood protection works in Loutraki
Geotechnical field survey and study to determine the necessary support system for excavations due to the new storm network.
Hydraulic study for Gialova sewer network, inculcating pumping stations.
Technical consultant for enhancing and improving Athens’ water supply network.
The aim of this study is the restoration of the road in Asprogerakata - Pefkoulia road in Lefkada, approximately 1.7 km in length.
The aim of the project is to reconstruct the existing sewer network in Poros in order to restore its functionality.
This study focuses of analyzing the events that led to the floods of 25-26 June 2016.
This study is a complimentary geotechnical and hydraulic study, for the new culvert in Kanari street.
Hydraulic study for flood risk management plans implementation in Eastern and Central Macedonia and Thrace