A complete study for a brand new seaside tourist center in Elia, Molaoi.
Geotechnical field survey in Sapfo stream in Marousi.
Due to severe rock sliding / falling in Delphi A open channel at Mornos aqueduct, a retaining wall was design to prevent this phenomenon.
The aim of the study is the expansion of the coastline and the creation of a seaside sidewalk.
Design of sewer network and waste management facility in Elafonisos village in Elafonisos.
A new municipal seaside building in Neapoli that will serve as a community and administrative center.
A geotechnical survey and study was conducted for the new football stands in Tolo Stadium in Nafplio.
Geotechnical field survey and study for a new primary school in Anifi.
Design of a new bridge in Thrasimi stream, Toubitsi, Municipality of Gortynia.
A new kindergarten in Batharistra Corinth was designed, for 100 children.
Geotechnical field survey and study for a primary school expansion in Lygourio.
Agia Triada primary school expansion by adding areas of 980 m² total.