2015
Municipality of Monemvasia
720,000
Finished
The purpose of the study was to implement the expansion of the existing seaside sidewalk by extensing the coastline through appropriate works.
The purpose of the study was to implement the expansion of the existing seaside sidewalk by extensing the coastline through appropriate works.
The aim of the study is to renew the environmental permit for an existing concrete plant in Gkagkania, Municipality of Evrotas
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.