2015
Athens Water Supply and Sewerage Company
320,000
Finished
This technical study focused on the design of a retaining wall along Delphi A’ open channel at Mornos aqueduct. Its purpose is to protect the channel by collecting rocks that slide / fall along the channel. The total length of the retaining wall is 40 m. Along with the wall, an energy absorption fence and an 80 m curtain grid are placed.
