2023
Municipality of East Samos
2870000
Finished
The study included the preparation of the electromechanical preliminary study, i.e. the full functional design (hydraulics, hoists, grating, blocking beams, Electrical - automation, telecommunications, other main and/or auxiliary installations) for the upgrade of the Pythagoreio wastewater treatment plant. It also inlcuded the environmental impact study from the construction and operation of the project.
