Wind farm consisting of 5 wind turbines with a rated power of 2 MW each.
The objective of the study is to create a network of internal roads during the construction and operation phases of the project.
Wind farm infrastructure projects as follows:
a) New substation MV / HV.
b) Electric line consisting of underground cables will be at a voltage of 20,000 volts, total length about 6 km, for the transfer of energy from Wind Farm in the substation
c) Internal wind farm road construction