2024
Ministry of Culture
1640000
Finished
The aim of the study is to assess the structural integrity of the existing works and calculate the structural bahavior of the new proposed flood control works at the Minoan Palace of Malia, Crete.
The aim of the study is to assess the structural integrity of the existing works and calculate the structural bahavior of the new proposed flood control works at the Minoan Palace of Malia, Crete.
Renewal of expired environmental terms of an existing private concrete facility in Nemea.
Renewal of expired environmental terms of an existing private concrete facility in Corinth.
Renewal of expired environmental terms of an existing private concrete facility in Sikyona.