2014
Municipality of Corinth
Finished
To equate a land zone to a port zone, a land survey must be conducted. This was the case for Assos port.
To equate a land zone to a port zone, a land survey must be conducted. This was the case for Assos port.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.