2008
Municipality of Nafplio
Finished
This study deals with reducing salt concentration in potable water in Nafplion, by proposing and dimensiong a mixing system between sources with different salt concentration.
This study deals with reducing salt concentration in potable water in Nafplion, by proposing and dimensiong a mixing system between sources with different salt concentration.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.