2008
Municipality of Pallini
1,100,000
Finished
The aim of the study is the design of water network and supply of Vakalopouos area in Pallini. It includes the following:
• Design of internal water supply network
• Dimensioning and hydraulic control of all required works
• Firefighting scenarios
• Construction plans
• Calculations
• Auction documents
