Streamflow modification study for GCS00 TAP pipleline

Flood protection infrastructure needed along the perimeter of TAP’s compressor station.
Streamflow modification study for GCS00 TAP pipleline
2014
Private
Finished

The aim of this report is to estimate the necessary flood protection infrastructure needed along the perimeter of TAP’s compressor station, in order to route the storm water from the station to the nearby streams. The basic drainage works consists of a network of ditches (of various slopes and widths) along the station roads as shown in the layout drawing.

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit modification for Psilos Cavos fish farming
Environmental permit modification for Psilos Cavos fish farming

Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.

Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis
Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis

Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.

Technical environmental study for Naxos' airport expansion
Technical environmental study for Naxos' airport expansion

Technical environmental study for Naxos' airport expansion construction.