The aim of this report is to estimate the necessary flood protection infrastructure needed along the perimeter of TAP’s compressor station, in order to route the storm water from the station to the nearby streams. The basic drainage works consists of a network of ditches (of various slopes and widths) along the station roads as shown in the layout drawing.