2008
Municipality of Trifylia
1,650,000
Finished
The purpose of this study us to design and dimension a new storm network in Kyparissia, in order to minimize flood damages.
The purpose of this study us to design and dimension a new storm network in Kyparissia, in order to minimize flood damages.