2011
Municipality of Pallini
4,200,000
Finished
The purpose of the study is to design a new storm network in order to minimize flooding in Gerakas.
The purpose of the study is to design a new storm network in order to minimize flooding in Gerakas.
The aim of the study is to renew the environmental permit for an existing concrete plant in Gkagkania, Municipality of Evrotas
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.