Geotechnical study of Avlospilos dock

This geotechnical study was used for the existing dock’s expansion.
Geotechnical study of Avlospilos dock
2019
Municipality of Monemvasia
Finished

To protect ships from waves and ripples, it was decided to expand the existing dock’s infrastructure. A geotechnical filed survey was necessary in order to estimate the soil characteristics and correctly dimension all expansion works.

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit modification for Psilos Cavos fish farming
Environmental permit modification for Psilos Cavos fish farming

Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.

Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis
Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis

Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.

Technical environmental study for Naxos' airport expansion
Technical environmental study for Naxos' airport expansion

Technical environmental study for Naxos' airport expansion construction.