Geotechnical study of Avlospilos dock

This geotechnical study was used for the existing dock’s expansion.
Geotechnical study of Avlospilos dock
2019
Municipality of Monemvasia
Finished

To protect ships from waves and ripples, it was decided to expand the existing dock’s infrastructure. A geotechnical filed survey was necessary in order to estimate the soil characteristics and correctly dimension all expansion works.

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit renewal for an existing concrete plant in Nemea
Environmental permit renewal for an existing concrete plant in Nemea

Renewal of expired environmental terms of an existing private concrete facility in Nemea.

Environmental permit renewal for an existing concrete plant in Corinth
Environmental permit renewal for an existing concrete plant in Corinth

Renewal of expired environmental terms of an existing private concrete facility in Corinth.

Environmental permit renewal for an existing concrete plant in Sikyona
Environmental permit renewal for an existing concrete plant in Sikyona

Renewal of expired environmental terms of an existing private concrete facility in Sikyona.