Agrokipio geotechnical study in Paros

The aim of the project was to determine the stratification, physical and mechanical properties of the soil formations, the groundwater level and to estimate all geotechnical parameters needed to design the foundation of the new building
Agrokipio geotechnical study in Paros
2017
Municipality of Paros
Finished

In summary, this geotechnical survey and the accompanying study aimed to:

• Obtain soil samples from boreholes.
• Obtain soil samples from wells.
• Perform on-site Standard Penetration Tests (SPT).
• Determine groundwater level position.
• Perform lab tests to estimate all soil parameters.

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit modification for Psilos Cavos fish farming
Environmental permit modification for Psilos Cavos fish farming

Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.

Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis
Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis

Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.

Technical environmental study for Naxos' airport expansion
Technical environmental study for Naxos' airport expansion

Technical environmental study for Naxos' airport expansion construction.