2021
Municipality of Nemea
Finished
The aim of the consultancy was the renewal and modification of Nemea’s waste water treatment environmental permit.
The aim of the consultancy was the renewal and modification of Nemea’s waste water treatment environmental permit.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.