2013
Municipality of Epidaurus
2,900,000
Finished
The aim of the study is the expansion of the existing waste treatment plant in Lygourio, including a new environmental permit.
The aim of the study is the expansion of the existing waste treatment plant in Lygourio, including a new environmental permit.
The aim of the study is to renew the environmental permit for an existing concrete plant in Gkagkania, Municipality of Evrotas
The aim of the study is to renew the environmental permit for an existing concrete plant in Alaouzi, Municipality of Evrotas
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.