2019
Municipality of Epidaurus
Finished
Due to the absence of environmental permit for the waste treatment facility in Ancient Epidaurus, operating or upgrading it was impossible. This study aimed to obtain an environmental permit.
Due to the absence of environmental permit for the waste treatment facility in Ancient Epidaurus, operating or upgrading it was impossible. This study aimed to obtain an environmental permit.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.