2024
Prefecture of Peloponnese
Finished
The aim of the study was to obtain a new environmental permit for the construction of Platsa level circular interchange at Platsa, Tripolis.
The aim of the study was to obtain a new environmental permit for the construction of Platsa level circular interchange at Platsa, Tripolis.
Renewal of expired environmental terms of an existing private concrete facility in Nemea.
Renewal of expired environmental terms of an existing private concrete facility in Corinth.
Renewal of expired environmental terms of an existing private concrete facility in Sikyona.