2024
Prefecture of Peloponnese
Finished
The aim of the study was to obtain a new environmental permit for the construction of Platsa level circular interchange at Platsa, Tripolis.
The aim of the study was to obtain a new environmental permit for the construction of Platsa level circular interchange at Platsa, Tripolis.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.