2024
Ministry of Defense
1025000
Finished
The aim of the study is to propose modification in order to improve the energy efficiency and reduce the energy consumption of military buildings in Araxos airport.
The aim of the study is to propose modification in order to improve the energy efficiency and reduce the energy consumption of military buildings in Araxos airport.
Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.
Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.
Technical environmental study for Naxos' airport expansion construction.