Fire protection of Molaoi hospital

Complete fire protection study (active - passive) for Molaoi hospital.
Fire protection of Molaoi hospital
2019
Municipality of Monemvasia
Finished

Molaoi hospital consists of three levels: basement, ground floor and floor. The fire protection study included:

• Manual alarm system
• Automatic fire detection system in all areas
• Local fire extinguishing system (bubble).
• Automatic CO2 extinguishing system in common areas and boiler room.
• Permanent water supply network with fire extinguishers in the surrounding area.
• Simple water supply network inside the building.

 

View also
ENCODIA serves both public and private sectors and up to this date, we offer solutions and support to a variety of engineering fields.
Environmental permit modification for Psilos Cavos fish farming
Environmental permit modification for Psilos Cavos fish farming

Environmental permit modification for Psilos Cavos fish farming installation in Plateia Island.

Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis
Environmental permit for existing concrete plant in Veligosti, Municipality of Megalopolis

Environmental permit renewal for an existing concrete plant in Veligosti, Municipality of Megalopolis.

Technical environmental study for Naxos' airport expansion
Technical environmental study for Naxos' airport expansion

Technical environmental study for Naxos' airport expansion construction.