Urban road and rainwater neworks for Molaoi city expansion


The aim of the study is to design a) the new road network and b) a new storm network for Molaoi city expansion.

In this project, 9.5 km of paved roads and 2 km of sidewalks along with 5 km of storm network were designed. This networks were necessary for the implementation of the city expansion.