Storm network in Kanari street
- 8/21/2017
- Prefecture of Attica
- 2017
- 7,510,000
- Finished
This study is a complimentary geotechnical and hydraulic study, for the new culvert in Kanari street.
This study is a complimentary geotechnical and hydraulic study, for the new culvert in Kanari street. The culvert is closed rectangular 4.8 x 2.3 m.
View also
This consultancy aimed to organize a complete proposal for the waste treatment installation upgrade.
This is a complete study for modifying flood protection works and for a private port in Waterfront, Navarino, Messinia.
Small stream delineation in Nemea
1/24/2021
Small stream delineation in Nemea according to Laws 1650/1986 and 3010/2002.