New storm network in Marousi Center
- 3/28/2016
- Municipality of Marousi
- 2016
- 600,000
- Finished
The Center is an area in Marousi without storm network. This study aims to design a new storm network.
The Center is an area in Marousi without storm network. This study aims to design a new storm network to prevent the whole area from flooding.
View also
This consultancy aimed to organize a complete proposal for the waste treatment installation upgrade.
This is a complete study for modifying flood protection works and for a private port in Waterfront, Navarino, Messinia.
Small stream delineation in Nemea
1/24/2021
Small stream delineation in Nemea according to Laws 1650/1986 and 3010/2002.