The purpose of this study is to investigate the feasibility of establishing a Municipal Port Fund or Municipal Port Office in the territory of the Municipality of Xylokastro - Evrostina and to assess its viability.
The aim of the study is to define the coastline and the shoreline in front of Hydra Beach hotel in Ermioni.
With the equalization of Agios Nikolaos Taktikoupolis port with a port zone, the port has both a sea and a land zone.
The aim of the consultancy was to obtain a permit for the new port in Taktikoupoli.
The aim of the study is to design and obtain all permits for a new industrial dock
Consultant services for obtaining necessary permits for the construction of Plaka porrt in Leonidion.
The aim of the study is to correctly reposition coastline and shoreline along Karelion hotel in Loutraki.
This study examines the wave conditions and proposes the reconstruction of the existing road at Lake Vouliagmeni in Loutraki
The aim of the study is to correctly reposition coastline and shoreline in front of Xylokastro Marina.
Maritime, structural and environmental studies for the expansion of Nafplion Port.
The aim of the study is to correctly reposition coastline and shoreline along Palace hotel in Loutraki.
The purpose of this project is to resize the existing land port zone of Loutraki.