With this study, the sewer disposal pipe was dimensioned.
Streams delineations in Molaoi according to Laws 1650/1986 and 3010/2002.
This project aims to monitor the quantitative and qualitative characteristics of the rivers Erythropotamos, Arda and Evros (please see extended description).
Hydraulic study for flood protection of Agios Ioannis road in Serifos.
This study is for a brand new sewer network along with a waste treatment plant in Kollines.
This study is for a brand new sewer network along with a waste treatment plant in Vourvoura.
This consultancy aimed to assist the Prefecture of Eastern Macedonia and Thrace about water management issues regarding Hellenic - Bulgarian - Tuskish co-management of Evros’ basin.
This study is for a brand new sewer network along with a waste treatment plant in Vlachokerasia.
This study aims to design a tertiary processing module for the urban waste management in Herakleion’s industrial area.
The purpose of this study is to delineate and protect multiple streams in Ptolemaida.
The aim of the project is the design on a new storm network in Kleitos.
New water network for Kleitos, a relocated settlement.