2013
Municipality of Papagou - Cholargos
Finished
The aim of the present study is to calculate and design the necessary storm drainage works and estimate their costs in two urban streets. In particular:
a) Sarantaporou Street from 25th March to the existing outflow in Mesogeion Avenue
b) Ymittou Street from Eleftherios Venizelos Street until March 25th