New fertilizer production plant with mixing


The aim of these studies was to obtain an environmental permit for the new fertilizer production plant with mixing in Examilia and to recognize the road as pre-existing year 1923.

The aim of these studies was to obtain an environmental permit for the new fertilizer production plant with mixing in Examilia and to recognize the road as pre-existing year 1923, in order to obtain a building permit.

View also

Temporary storage unit for hazardous waste of sanitary units environmental permit renewal

View more

Temporary storage unit for hazardous waste of sanitary units environmental permit renewal.

View more

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

View more

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

View more

Renewal of kernel oil installation permit in Argos - Mykines

View more

This study aims to renew an environmental permit of a kernel oil refinery in Argos - Mykines.

View more