Environmental study for industrial cannabis production in Korinthos


This study aims for environmental permit regarding a new industrial cannabis installation.

Industrial cannabis installations are new to hellenic law (2018). This study, got an environmental permit for the first installation of industrial cannabis in Greece. Also, a geotechnical field survey for the implementation of the installation was carried out.

View also

Temporary storage unit for hazardous waste of sanitary units environmental permit renewal

View more

Temporary storage unit for hazardous waste of sanitary units environmental permit renewal.

View more

New fertilizer production plant with mixing

View more

The aim of these studies was to obtain an environmental permit for the new fertilizer production plant with mixing in Examilia and to recognize the road...

View more

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

View more

Environmental permit modification of children’s camp in Corinth of a total capacity of 1650 children per period

View more