New Vragiana - Rogia road in Evrytania


The present study focuses on a new road, connecting Vragiana and Rogia in Evrytania.

The new connector road Vigniana - Rogga at the borders of  Evritania in basically a major improvement of the existing dirt road. The new road is a two-way paved road with pavements, approximately 6.2 km long. In its design, full flood protection works are included such as culverts, pavement drainage and gutters. Finally the project has been environmentally evaluated and approved by the Decentralized Administration.

APPROVED

View also

Improvement of the coastal road Nies - Ag. Marina of Almyros Municipality (11.5 km).

View more

Land survey and transportation studies for improving the existing costal road in Nies, Municipality of Almyros.

View more

Road repair study at Asprogerakata - Pefkoulia, Lefkada

View more

The aim of this study is the restoration of the road in Asprogerakata - Pefkoulia road in Lefkada, approximately 1.7 km in length.

View more

Transportation study at ’Kostea Gitona’ school in Pallini

View more

The purpose of this study is to design the temporary traffic measures required to deal with peak traffic conditions during students’ arrival and departure.

View more