New sewer network and waste treatment plant in Elafonisos


Design of sewer network and waste management facility in Elafonisos village in Elafonisos.

Elafonisos village is the largest settlement in Elafonisos and has a peak population of 1000 people. The purpose of the study was to design a new sewer network that will collect all urban waste and lead them to a waste management facility outside the village. The facility will be able to process the collected waste into mud and irrigable water.

View also

Technical consultant for Antonis Tritsis program, Sikiona

View more

This consultancy aimed to organize a complete proposal for the waste treatment installation upgrade.

View more

New stream delineation and private port in Waterfront, Messinia

View more

This is a complete study for modifying flood protection works and for a private port in Waterfront, Navarino, Messinia.

View more

Small stream delineation in Nemea

View more

Small stream delineation in Nemea according to Laws 1650/1986 and 3010/2002.

View more