Environmental
This Technical Environmental Study concerns the temporary installation of a crusher - recovery complex for creating fill material out of unneeded excavations.
Modify and renew the approved environmental terms of a Wind Farm (4.8 MW capacity) of WRE Hellas, in ’Alonia’, Municipality of Monemvasia.
Corinth port parking lot operation
4/21/2016
The purpose of this study is to design the operation of the parking lot in the Port of Corinth.
The aim of the study was to obtain an environmental permit for rainwater drainage flood protection works in Molaoi.
Landscapping in Elafonisos’ common areas
11/20/2014
Landscapping in Elafonisos’ common areas, including the coastline.
Environmental Impact Study regarding coastal protection from erosion and artificial reefs at the bottom of the sea at ’St. Nicholas ’, Municipality of...