10 MW Wind Farm in Mavragani - Lykotopi


10 MW Wind Farm in Mavragani - Lykotopi, Southern Kynouria Municipality (Arcadia)

Wind farm consisting of 5 wind turbines with a rated power of 2 MW each.

The objective of the study is to create a network of internal roads during the construction and operation phases of the project.

Wind farm infrastructure projects as follows:

a) New substation MV / HV.
b) Electric line consisting of underground cables will be at a voltage of 20,000 volts, total length about 6 km, for the transfer of energy from Wind Farm in the substation
c) Internal wind farm road construction

View also

Improvement of the coastal road Nies - Ag. Marina of Almyros Municipality (11.5 km).

View more

Land survey and transportation studies for improving the existing costal road in Nies, Municipality of Almyros.

View more

New Vragiana - Rogia road in Evrytania

View more

The present study focuses on a new road, connecting Vragiana and Rogia in Evrytania.

View more

Road repair study at Asprogerakata - Pefkoulia, Lefkada

View more

The aim of this study is the restoration of the road in Asprogerakata - Pefkoulia road in Lefkada, approximately 1.7 km in length.

View more