New water supply network in Tinos


A new water supply network was designed to meet the increasing potable water demand in Tinos.

The inadequate existing water network is replaced with a new potable watet network im regions of Agia Paraggeria and Glikaniso. 3rd generation polyethylene pipes were used and extensive tests of water hammer were conducted.

View also

Sewer network reconstruction in Poros

View more

The aim of the project is to reconstruct the existing sewer network in Poros in order to restore its functionality.

View more

Hydraulic study of Dolianitis - Saradaporos streams

View more

This study focuses of analyzing the events that led to the floods of 25-26 June 2016.

View more

Hydraulic study of internal sewer network expansion in Pallini

View more

This project expanded the basic sewer network in Pallini, in order to cover all neighborhoods.

View more